Kitchen Remodel cost in Winston-Salem, NC
Winston-Salem, NC · updated August 2026
$37,300
Typical local cost
$17,400 – $89,100
Typical range
- per kitchen
- $17,400 – $89,050
- Permit
- It depends
- Typical timeline
- 6-12 weeks
Installed, local pricing
$185 – $885 in fees
6-12 weeks
Winston-Salem runs -3% against the U.S. average · data confidence Medium · modeled estimate, not a quote
The modeled midpoint for Winston-Salem is $37,300. The local adjustment for this trade is x0.968 — driven mainly by Forsyth County labor rates and 20% exposure to local code requirements.
Estimate your Winston-Salem job
Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.
Flooring to buy
330 sq ft
300 sq ft room + 10% waste
- Boxes needed
- 14 boxes
- Installed cost estimate
- $1,728 – $2,643
- Underlayment
- 300 sq ft
Priced for Winston-Salem (local adjustment x0.968).
Estimates only. Local pricing, site conditions and code requirements change the real number.
Cost by project size
Generated from the same unit pricing the calculator uses.
| Project size | Estimated range |
|---|---|
| Small kitchen (under 100 sq ft) | $12,200 – $62,400 |
| Midsize kitchen (100–200 sq ft) | $17,400 – $89,100 |
| Large kitchen (200–300 sq ft) | $24,400 – $124,700 |
| Full gut with layout change | $34,800 – $178,200 |
Based on Winston-Salem pricing of $17,400–$89,050 per kitchen.
Where the money goes
- Labor
- $16,800
- 44% of median
- Materials
- $20,500
- 54% of median
- Permit & fees
- $535
- 1% of median
Winston-Salem project costs-3% vs U.S. average
Based on Forsyth County labor rates, local material logistics and permit-fee posture for this trade.
What the project looks like start to finish
Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.
01
Planning & quotes
Scope, material choice, contractor selection
02
Permit application
Filed with City of Winston-Salem building department
03
Materials & staging
Order lead time on non-stock materials
04
Installation
6-12 weeks
05
Inspection
Rough plumbing and electrical, Framing where walls change, Final building inspection
06
Closeout
Final sign-off, warranty and documentation
Winston-Salem labor intelligence
What the trade charges here, and how much of your price it is.
Loaded hourly rate
$48–$62
Interior crews in Forsyth County · -6% vs U.S. ($58/hr)
Typical crew
4 × 9.5 days
On-site time for a typical kitchen job here.
Labor in the price
$16,800
45% of the median — the rest is material, disposal and permit.
Because labor is 45% of this job, Winston-Salem wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.
Basis: Hometriva labor model: national interior crew rates adjusted by the Forsyth County labor factor (x0.935). · BLS Occupational Employment and Wage Statistics, Hometriva methodology
Why Winston-Salem differs from the national average
The local delta, broken into dollars by driver.
Trade labor rates-$1,125
Forsyth County crews price 6% below the national average, and labor is 45% of this job.
Material and delivery-$250
Materials are nationally traded, so they move less — but delivery into this market runs 1% under baseline.
Code and inspection load+$175
Kitchen Remodel carries 20% exposure to local code requirements, and this jurisdiction's review load indexes at x1.02.
Permit fees-$50
Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.
Basis: Decomposition of the modeled Winston-Salem median against the U.S. median for this scope. · City of Winston-Salem building department, Hometriva methodology
Winston-Salem vs North Carolina vs the U.S.
Change the inputs, see your number
The same local model, run against your job instead of the average one.
Simulated kitchen remodel in Winston-Salem
$37,835
Likely range $17,935 – $89,635
Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.
What makes the number move
- Cabinet grade: stock, semi-custom or custom
- Countertop material and square footage
- Whether plumbing or electrical is relocated
- Appliance package
- Flooring and any wall removal
Who issues each permit
Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.
| Discipline | Issuing authority |
|---|---|
| building | City of Winston-Salem building departmentModeled estimate |
| electrical | City of Winston-Salem building departmentModeled estimate |
| mechanical | City of Winston-Salem building departmentModeled estimate |
| plumbing | City of Winston-Salem building departmentModeled estimate |
| zoning | City of Winston-Salem building departmentModeled estimate |
| fire | City of Winston-Salem building departmentModeled estimate |
Permit requirement in Winston-Salem
It depends on scope. Like-for-like cosmetic work in Winston-Salem is often exempt, but a permit is required as soon as you change structure, plumbing, electrical or the building envelope.
- Permitting authority
- City of Winston-Salem building departmentModeled estimate
- Permit fee
- Estimated allowance $185–$885Modeled from comparable fee schedules — not an official quoted fee.
Inspections
- Rough plumbing and electrical
- Framing where walls change
- Final building inspection
Local conditions that change this job
Only the exposures that materially affect kitchen remodel.
Humidity
Severe84/100
Owner-occupied homes
0%
Owner-occupied share of the housing stock, which drives how much of this work is homeowner-funded versus landlord-funded.
Households in market
99,818
Approximate household count in Winston-Salem, used to size the contractor pool for this trade.
Permit activity index
x0.93
Relative permit volume and fee load versus the national baseline.
Nearby market comparison
| Market | Local factor | Median | Per kitchen |
|---|---|---|---|
| Winston-Salem (this page) | x0.968 | $37,300 | $17,400 – $89,050 |
| High Point | x0.949 | $36,500 | $17,100 – $87,300 |
| Greensboro | x0.968 | $37,300 | $17,400 – $89,050 |
| Charlotte | x0.981 | $37,800 | $17,650 – $90,250 |
What Winston-Salem homeowners actually paid
Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.
Quotes homeowners were given in Winston-Salem
Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.
How Hometriva estimates Winston-Salem kitchen costs
Hometriva does not publish invented city prices. The Winston-Salem estimate for kitchen remodel is produced by this chain, and every input is stored separately:
- National baseline$38,500
Typical U.S. cost for kitchen remodel on a single-family home.
- Local labor factorx0.935
Winston-Salem-area trade labor rates, weighted at 45% of this job.
- Material factorx0.988
Material and delivery pricing into Forsyth County, weighted at 55%.
- Regulatory factorx1.022
Local code, product-approval and inspection load, applied at 20% for this project type.
- Applied multiplierx0.968
Blended Winston-Salem adjustment specific to kitchen remodel.
- Permit component$185 – $885
Budgeted separately from the contract price because it is paid to the jurisdiction.
Because labor, material and regulatory factors are weighted per project, kitchen remodel in Winston-Salem carries a different local adjustment than other trades in the same market.
Reviewed by
Hometriva Cost Data Desk
Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for kitchen remodel pricing in Winston-Salem, NC.
- • National unit-cost baselines against current trade pricing
- • Local labor and materials factors for the market
- • Material installed-cost ranges and service life
Last reviewed August 2026 · Editorial standards · Report an error
Frequently asked questions
Do I need a permit for a kitchen remodel?
Cosmetic replacement — cabinets in the same location, countertops, appliances, paint and flooring — typically does not require a permit. You do need one as soon as you move plumbing or electrical, add circuits, or alter walls.
How long does a kitchen remodel take?
A cosmetic refresh runs 3-5 weeks. A full gut with layout changes and permits typically runs 8-12 weeks, with cabinet lead time as the most common bottleneck.
How long does kitchen remodel take?
6-12 weeks. Permit review and inspection scheduling are usually the largest source of variation.
What changes the price the most?
The largest cost drivers are cabinet grade: stock, semi-custom or custom; countertop material and square footage; whether plumbing or electrical is relocated.
Sources
Sources & verification
Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.