South Carolina · Interior

Kitchen Remodel cost in South Carolina

Statewide pricing, permit posture and inspection sequence for kitchen remodel in South Carolina. Your city or county issues the actual permit — use the local links below to confirm fees.

Verified August 2026

Kitchen Remodel cost in South Carolina

$16,600 – $84,600

Most South Carolina homeowners pay around $35,400, or $16,550$84,650 per kitchen. Permit fees typically add $180$855.

Permit: It depends. South Carolina Residential Code, based on the IRC

Cost breakdown

Budget scope$16,600
Typical project$35,400
Premium / complex$84,600
per kitchen$16,550 – $84,650
Permit fees$180 – $855
vs national baseline-8%
Timeline6-12 weeks

What is different about kitchen remodel in South Carolina

Charleston and Horry County enforce coastal wind and elevation rules plus historic review; upstate Greenville prices and permits like the interior Southeast.

Owner-builder: Homeowner permits allowed on owner-occupied property. Kitchen Remodel is one of the scopes a homeowner can more realistically permit themselves.

Inspections

  • Rough plumbing and electrical
  • Framing where walls change
  • Final building inspection

What drives the price

  • Cabinet grade: stock, semi-custom or custom
  • Countertop material and square footage
  • Whether plumbing or electrical is relocated
  • Appliance package
  • Flooring and any wall removal

Frequently asked questions

Do I need a permit for a kitchen remodel?

Cosmetic replacement — cabinets in the same location, countertops, appliances, paint and flooring — typically does not require a permit. You do need one as soon as you move plumbing or electrical, add circuits, or alter walls.

How long does a kitchen remodel take?

A cosmetic refresh runs 3-5 weeks. A full gut with layout changes and permits typically runs 8-12 weeks, with cabinet lead time as the most common bottleneck.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.